Stormwater

EPA requires construction site operators that disturb one or more acres of land and have water leaving their site to obtain coverage under a general permit authorized under the National Pollutant Discharge Elimination System (NPDES) Program, operated either by the state or by EPA. The resources below provide information on EPA and state stormwater programs and permits, as well as compliance guides developed by NAHB exclusively for members.

Storm Water
Sort By:
Include Archived Content:
Page 1 of 1 (3 Results)
TitleType
N/A
Web page
EPA staff's presentation to the NAHB Environmental Issues Committee member on the proposed changes to the EPA Construction General Permit.
6/3/2011
PDF
On April 25, 2011, EPA issued a revised construction general permit (CGP) for public comment. The CGP is the permit issued under the Clean Water Act’s National Pollutant Discharge Elimination System (NPDES) program to authorize the discharge of stormwater from construction sites. The CGP applies …
5/6/2011
PDF
  
Page 1 of 1 (3 Results)

Looking for something? Older content no longer displays on these pages, but may still be available.
View all content in this section or search our site, including archives.